ITAC Assessment: CO0238
ITAC logo
ITAC Assessment: CO0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product Carbonated Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 110,000
ft2
Annual Production 4,300,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,557 1,414,420
kWh
Natural Gas $25,707 5,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,900

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8121: Apply for tax-free status for energy purchases $700 $250 - $700
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $250 $220 $250
4,982
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $300 $450 $150
5,862
kWh
$150
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,540 $820 $4,540
65,358
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $540 $200 $540
7,913
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $320 $1,000 $320
4,689
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $250 $1,060 $250
3,517
kWh
-
TOTAL RECOMMENDED $6,900 $4,000 $6,050
92,321
kWh
$850
-
MMBtu
TOTAL IMPLEMENTED $6,900 $4,000 $6,050
92,321
kWh
$850
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs