ITAC Assessment: TN0510
ITAC logo
ITAC Assessment: TN0510
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Face Brick
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 88,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,864
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,541 5,351,114
kWh
Natural Gas $797,733 259,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,458

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $13,700 - $13,700
279,601
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,662 $1,725 $3,662
74,736
kWh
03 2.7261: Install timers and/or thermostats $1,106 $2,100 $1,106
22,567
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,652 $1,930 $1,652
33,705
kWh
05 2.7144: Install spectral reflectors / delamp $1,309 $2,928 $1,309
24,326
kWh
06 2.4221: Install compressor air intakes in coolest locations $675 $240 $675
13,775
kWh
TOTAL RECOMMENDED $22,104 $8,923 $22,104
448,710
kWh
TOTAL IMPLEMENTED $16,458 $4,030 $16,458
335,873
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs