ITAC Assessment: OR0808
ITAC logo
ITAC Assessment: OR0808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Research
NAICS 423690: Other Electronic Parts and Equipment Merchant Wholesalers
SIC 5065: Electronic Parts and Equipment, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 325
Plant Area 200,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $628,591 9,823,622
kWh
Electricity Demand $324,725 33,169
kW-mo/yr
Electricity Fees $61 -
Natural Gas $104,829 14,191
MMBtu
TOTAL YEARLY COSTS $1,058,205
RECOMMENDED SAVINGS* $287,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $13,430 - $13,430
209,879
kWh
- -
02 2.2624: Use cold waste water to cool chiller feed water $8,055 - $8,055
125,874
kWh
- -
03 2.7314: Reduce ventilation air $6,836 - $771
12,052
kWh
- $6,065
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $3,076 - $3,076
48,075
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,143 $30,877 $2,176
34,002
kWh
$1,967
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $252,440 $4,458,259 $240,049
3,751,348
kWh
$12,391
-
kW-mo/yr
-
TOTAL RECOMMENDED $287,980 $4,489,136 $267,557
4,181,230
kWh
$14,358
-
kW-mo/yr
$6,065
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs