Assessment Year | 2025 |
---|---|
Principal Product | Research |
NAICS | 423690: Other Electronic Parts and Equipment Merchant Wholesalers |
SIC | 5065: Electronic Parts and Equipment, Not Elsewhere Classified |
Sales Range | less than $500 k |
# of Employees | 325 |
Plant Area |
200,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $628,591 | 9,823,622 |
kWh
|
$0.064 |
Electricity Demand | $324,725 | 33,169 |
kW-mo/yr
|
$9.79 |
Electricity Fees | $61 | - |
|
- |
Natural Gas | $104,829 | 14,191 |
MMBtu
|
$7.39 |
TOTAL YEARLY COSTS | $1,058,205 | |||
RECOMMENDED SAVINGS* | $287,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $13,430 | - |
$13,430
209,879
kWh
|
- | - | |
02 | 2.2624: Use cold waste water to cool chiller feed water | $8,055 | - |
$8,055
125,874
kWh
|
- | - | |
03 | 2.7314: Reduce ventilation air | $6,836 | - |
$771
12,052
kWh
|
- |
$6,065
-
MMBtu
|
|
04 | 2.7111: Reduce illumination to minimum necessary levels | $3,076 | - |
$3,076
48,075
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,143 | $30,877 |
$2,176
34,002
kWh
|
$1,967
-
kW-mo/yr
|
- | |
06 | 2.9114: Use solar heat to make electricty | $252,440 | $4,458,259 |
$240,049
3,751,348
kWh
|
$12,391
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $287,980 | $4,489,136 |
$267,557
4,181,230
kWh
|
$14,358
-
kW-mo/yr
|
$6,065
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs