ITAC Assessment: OR0808
ITAC logo
ITAC Assessment: OR0808
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Research
NAICS 423690: Other Electronic Parts and Equipment Merchant Wholesalers
SIC 5065: Electronic Parts and Equipment, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 325
Plant Area 200,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $970,851 9,823,622
kWh
Electricity Demand $324,724 33,169
kW-mo/yr
Natural Gas $110,874 14,191
MMBtu
TOTAL YEARLY COSTS $1,406,449
RECOMMENDED SAVINGS* $638,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7314: Reduce ventilation air $13,430 - $13,430
40,445
kWh
02 2.2624: Use cold waste water to cool chiller feed water $8,055 - $8,055
125,874
kWh
03 2.7314: Reduce ventilation air $6,836 - $6,836
12,052
kWh
04 2.7111: Reduce illumination to minimum necessary levels $3,076 - $3,076
48,075
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,145 $32,578 $4,145
34,002
kWh
06 2.9114: Use solar heat to make electricty $602,514 $4,458,259 $602,514
3,751,348
kWh
TOTAL RECOMMENDED $638,056 $4,490,837 $638,056
4,011,796
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs