ITAC Assessment: LT8443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Scrap Metal and Recyclable Materials
NAICS 423930: Recyclable Material Merchant Wholesalers
SIC 5093: Scrap and Waste Materials
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 108,000
ft2
Annual Production 32,662
ton
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,013 203,309
kWh
Electricity Fees $222 -
Fuel Oil #2 $201,387 10,635
MMBtu
Other Energy $9,969 1
MMBtu
Waste Disposal Costs
Water Usage $3,354 1,150
Tgal
Water Disposal $3,136 1,150
Tgal
Other Liquid (non-haz) $64 1
gal
TOTAL YEARLY COSTS $240,145
RECOMMENDED SAVINGS* $344,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $155 - $155
1,433
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $60,922 $686,315 - $60,922
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $263 $713 $263
2,424
kWh
-
04 2.9114: Use solar heat to make electricty $283,539 $2,113,200 $283,539
2,618,091
kWh
-
TOTAL RECOMMENDED $344,879 $2,800,228 $283,957
2,621,948
kWh
$60,922
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs