ITAC Assessment: SU0476
ITAC logo
ITAC Assessment: SU0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Lithium Batteries & Rechargeable Battery Packs
NAICS 335912: Primary Battery Manufacturing
SIC 3692: Primary Batteries, Dry and Wet
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 280,000
ft2
Annual Production 400,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,458 6,637,706
kWh
Electricity Demand $109,516 15,586
kW-mo/yr
Electricity Fees $7,599 -
Natural Gas $55,804 10,160
MMBtu
Waste Disposal Costs
Water Usage $4,549 2,030
Tgal
TOTAL YEARLY COSTS $432,926
RECOMMENDED SAVINGS* $12,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7122: Disconnect ballasts $216 - $148
3,888
kWh
$68
-
kW-mo/yr
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,702 $131 - - $1,702
-
MMBtu
- -
03 2.7314: Reduce ventilation air $3,103 $894 $467
12,300
kWh
- $2,636
-
MMBtu
- -
04 2.7135: Install occupancy sensors $803 $433 $803
21,120
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $1,955 $1,607 $1,955
51,435
kWh
- - - -
06 3.1161: Eliminate/reduce an operation $5,095 $4,500 $(-16.0)
(-417)
kWh
$(-211.0)
-
kW-mo/yr
- $1,042 $4,280
TOTAL RECOMMENDED $12,874 $7,565 $3,357
88,326
kWh
$(-143.0)
-
kW-mo/yr
$4,338
-
MMBtu
$1,042 $4,280
TOTAL IMPLEMENTED $2,721 $564 $951
25,008
kWh
$68
-
kW-mo/yr
$1,702
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs