| Assessment Year | 2022 |
|---|---|
| Principal Product | Steel and Aluminum Coils |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
625,000
ft2
|
| Annual Production | 1,200,000
ton
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $665,540 | 8,202,065 |
kWh
|
$0.081 |
| Electricity Demand | $73,970 | 18,224 |
kW-mo/yr
|
$4.06 |
| Electricity Fees | $84,368 | - |
|
- |
| Natural Gas | $306,836 | 44,640 |
MMBtu
|
$6.87 |
| TOTAL YEARLY COSTS | $1,130,714 | |||
| RECOMMENDED SAVINGS* | $87,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $80,669 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $4,933 | - |
$4,663
46,627
kWh
|
$270
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,292 | $1,250 |
$7,833
78,330
kWh
|
$459
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $610 | $1,113 |
$607
6,071
kWh
|
$3
-
kW-mo/yr
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $6,592 | - |
$5,526
55,262
kWh
|
$1,066
-
kW-mo/yr
|
- | |
| 05 | 2.3132: Recharge batteries on during off-peak demand periods | $701 | - |
$433
-
kWh
|
$268
-
kW-mo/yr
|
- | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $47,027 | $242,692 |
$(-45,376.8)
(-453,768)
kWh
|
- |
$92,404
-
MMBtu
|
|
| 07 | 2.7444: Close holes and openings in building such as broken windows | $17,145 | $16,000 | - | - |
$17,145
-
MMBtu
|
|
| 08 | 2.7231: Use radiant heater for spot heating | $1,961 | $3,045 | - | - |
$1,961
-
MMBtu
|
|
| TOTAL RECOMMENDED | $87,261 | $264,100 |
$(-26,315.0)
(-267,478)
kWh
|
$2,066
-
kW-mo/yr
|
$111,510
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $80,669 | $264,100 |
$(-31,841.2)
(-322,740)
kWh
|
$1,000
-
kW-mo/yr
|
$111,510
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs