ITAC Assessment: AR0092
ITAC logo
ITAC Assessment: AR0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electric Meter Sockets
NAICS
n/a
SIC 3643: Current-Carrying Wiring Devices
Sales Range $1
M
to 5
M
# of Employees 117
Plant Area 72,200
ft2
Annual Production 480,000
pieces
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,819 1,069,168
kWh
Electricity Demand $59,149 3,960
kW-mo/yr
Natural Gas $37,694 9,679
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,425 $288 $614
19,930
kWh
$811
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $8,278 $3,750 $3,261
105,217
kWh
$5,017
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $1,104 $1,700 $439
14,068
kWh
$665
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,066 $6,000 $447
14,361
kWh
$619
-
kW-mo/yr
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $15,000 $160 - - $15,000
-
lb
TOTAL RECOMMENDED $26,873 $11,898 $4,761
153,576
kWh
$7,112
-
kW-mo/yr
$15,000
-
lb
TOTAL IMPLEMENTED $10,448 $11,450 $4,147
133,646
kWh
$6,301
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs