Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Roofing Systems
NAICS
n/a
SIC 2822: Synthetic Rubber (Vulcanizable Elastomers)
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 640,000
ft2
Annual Production 858,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,699 1,359,906
kWh
Electricity Demand $36,025 3,882
kW-mo/yr
Electricity Fees $600 -
Natural Gas $104,530 19,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,596 $200 $1,596
36,928
kWh
- - - - -
02 2.2449: Recover heat from exhausted steam, hot air or hot water $404 $900 - - $404
-
MMBtu
- - -
03 2.7111: Reduce illumination to minimum necessary levels $5,184 $90 $5,184
86,753
kWh
- - - - -
04 2.7135: Install occupancy sensors $100 $57 $80
1,758
kWh
$20
-
kW-mo/yr
- - - -
05 2.5195: Change product design to reduce energy requirements $228 $180 - - $228
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $2,375 $1,452 - - $2,375
-
MMBtu
- - -
07 2.7243: Improve air circulation with destratification fans / other methods $2,535 $5,200 - - $2,535
-
MMBtu
- - -
08 2.2515: Use optimum thickness insulation $9,970 $2,000 - - $9,970
-
MMBtu
- - -
09 2.2515: Use optimum thickness insulation $4,848 $6,210 - - $4,848
-
MMBtu
- - -
10 3.7222: Minimize overflows by installing level controls $360 $600 - - - - $200
-
lb
$160
11 3.7211: Modify material application methods $28,063 $2,040 - - - $88
-
gal
- $27,975
TOTAL RECOMMENDED $55,663 $18,929 $6,860
125,439
kWh
$20
-
kW-mo/yr
$20,360
-
MMBtu
$88
-
gal
$200
-
lb
$28,135
TOTAL IMPLEMENTED $54,671 $17,249 $6,860
125,439
kWh
$20
-
kW-mo/yr
$19,728
-
MMBtu
$88
-
gal
- $27,975
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs