Assessment Year | 2000 |
---|---|
Principal Product | Metal ties |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
113,060
ft2
|
Annual Production | 3,000,000,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,816 | 7,388,922 |
kWh
|
$0.045 |
Electricity Demand | $105,581 | 19,105 |
kW-mo/yr
|
$5.53 |
Electricity Fees | $17,094 | - |
|
- |
LPG | $68,143 | 9,110 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,000 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,836 | $1,000 |
$2,079
45,721
kWh
|
$757
-
kW-mo/yr
|
- | - | - | |
02 | 2.4224: Upgrade controls on compressors | $10,033 | $5,000 |
$10,033
220,692
kWh
|
- | - | - | - | |
03 | 2.4235: Remove or close off unneeded compressed air lines | $975 | $2,640 |
$784
17,292
kWh
|
$191
-
kW-mo/yr
|
- | - | - | |
04 | 2.5196: Use small number of high output units instead of many small inefficient units | $7,128 | $20,000 |
$5,223
114,889
kWh
|
$1,905
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $689 | $1,428 |
$399
8,499
kWh
|
$290
-
kW-mo/yr
|
- | - | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $17,072 | $24,000 |
$17,072
375,440
kWh
|
- | - | - | - | |
07 | 2.2424: Use heat in flue gases to preheat products or materials | $3,506 | $5,416 | - | - |
$3,506
-
MMBtu
|
- | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $75 | $260 | - | - | - |
$75
-
lb
|
- | |
09 | 2.1321: Replace fossil fuel equipment with electrical equipment | $8,686 | $25,740 |
$(-13,728.0)
(-301,876)
kWh
|
$(-4,436.0)
-
kW-mo/yr
|
$18,850
-
MMBtu
|
- | $8,000 | |
TOTAL RECOMMENDED | $51,000 | $85,484 |
$21,862
480,657
kWh
|
$(-1,293.0)
-
kW-mo/yr
|
$22,356
-
MMBtu
|
$75
-
lb
|
$8,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs