Assessment Year | 2001 |
---|---|
Principal Product | Brown Boxes |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
160,000
ft2
|
Annual Production | 1,000,000,000
thousand feet
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $532,619 | 12,698,304 |
kWh
|
$0.042 |
Natural Gas | $564,968 | 82,554 |
MMBtu
|
$6.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,217 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,169 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,200 | $3,420 |
$5,200
123,939
kWh
|
- | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $394 | $60 |
$394
9,376
kWh
|
- | - | - | - | - | |
03 | 2.2511: Insulate bare equipment | $8,016 | $866 | - | - |
$8,016
-
MMBtu
|
- | - | - | |
04 | 2.3212: Optimize plant power factor | $11,836 | $8,422 | - | $11,836 | - | - | - | - | |
05 | 2.4157: Establish a predictive maintenance program | $12,579 | $1,200 |
$12,579
305,599
kWh
|
- | - | - | - | - | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $14,330 | $3,980 | - | - |
$14,330
-
MMBtu
|
- | - | - | |
07 | 2.2113: Repair or replace steam traps | $14,790 | $1,000 | - | - |
$14,790
-
MMBtu
|
- | - | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $2,986 | $600 |
$2,986
71,199
kWh
|
- | - | - | - | - | |
09 | 3.5318: Recycle fluorescent lamps | $3,048 | $320 | - | - | - | - |
$3,048
-
lb
|
- | |
10 | 3.4116: Meter recycled water (to reduce sewer charges) | $11,038 | $2,000 | - | - | - |
$11,038
-
Tgal
|
- | - | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $15,000 | $6,000 | - | - | - | - | - | $15,000 | |
TOTAL RECOMMENDED | $99,217 | $27,868 |
$21,159
510,113
kWh
|
$11,836 |
$37,136
-
MMBtu
|
$11,038
-
Tgal
|
$3,048
-
lb
|
$15,000 | ||
TOTAL IMPLEMENTED | $81,169 | $21,548 |
$21,159
510,113
kWh
|
$11,836 |
$37,136
-
MMBtu
|
$11,038
-
Tgal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs