Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,745

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sanitary services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0103 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $110 $355
NL0103 #06 Y:2024 Install occupancy sensors $114 $428
NL0103 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $159 $140
NL0103 #04 Y:2024 Utilize higher efficiency lamps and/or ballasts $225 $428
NL0103 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $352 $1,758
NL0103 #02 Y:2024 Utilize energy-efficient belts and other improved mechanisms $887 $240
NL0103 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $34,173 $106,000
IC0318 #13 Y:2024 Install anaerobic digester $2,295,176 $9,930,710
IC0318 #12 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,250 $1,159
IC0318 #11 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $74,545 $10,174
IC0318 #10 Y:2024 Use or replace with energy efficient substitutes $62,936 $159,045
IC0318 #09 Y:2024 Eliminate or reduce compressed air usage $688 $63
IC0318 #08 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $371,239 $1,219,094
IC0318 #07 Y:2024 Install occupancy sensors $2,756 $391
IC0318 #06 Y:2024 Replace boiler $133,316 $376,143
IC0318 #05 Y:2024 Turn off equipment during breaks, reduce operating time $6,255 $8,951
IC0318 #04 Y:2024 Install equipment to utilize waste fuel $2,277,853 $9,581,351
IC0318 #03 Y:2024 Utilize energy-efficient belts and other improved mechanisms $833 $781
IC0318 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,649 $4,909
IC0318 #01 Y:2024 Insulate glazing, walls, ceilings, and roofs $11,344 $4,184