ITAC Assessment: MUWT07
ITAC logo
ITAC Assessment: MUWT07
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wastewater Treatment Facility
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 9
Plant Area 22,000
ft2
Annual Production 638,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,849 1,725,466
kWh
Electricity Demand $87,666 2,811
kW-mo/yr
Electricity Fees $23,536 -
Natural Gas $43,267 5,663
MMBtu
Other Gas $4,741 1
MMBtu
Waste Disposal Costs
Water Usage $788 33
Tgal
TOTAL YEARLY COSTS $226,847
RECOMMENDED SAVINGS* $6,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,429 $6,434 $1,747
44,806
kWh
$3,682
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $706 $432 $132
3,374
kWh
$574
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $124 $8 $59
1,515
kWh
$65
-
kW-mo/yr
-
04 2.7134: Use photocell controls $454 $562 $80
2,057
kWh
$374
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $29 $90 $14
350
kWh
$15
-
kW-mo/yr
-
06 2.7261: Install timers and/or thermostats $105 $38 - - $105
-
MMBtu
TOTAL RECOMMENDED $6,847 $7,564 $2,032
52,102
kWh
$4,710
-
kW-mo/yr
$105
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs