ITAC Assessment: OR0315
ITAC logo
ITAC Assessment: OR0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Baked goods
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area
n/a
Annual Production 480,000,000
lb
Production Hrs. Annual 6,860
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,497 2,897,714
kWh
Electricity Demand $11,216 77,076
kW-mo/yr
Electricity Fees $3,010 -
Natural Gas $123,967 29,665
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $6,113 $4,480 $5,597
169,695
kWh
$516
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $964 $1,000 $881
26,671
kWh
$83
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $934 - $853
25,791
kWh
$81
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $3,040 $2,700 - - - $3,040
-
MMBtu
05 2.4133: Use most efficient type of electric motors $2,591 $4,176 $2,329
70,633
kWh
$262
-
kW-mo/yr
- -
06 2.6218: Turn off equipment when not in use $2,120 - $2,120
64,185
kWh
- - -
07 2.3212: Optimize plant power factor $674 $3,200 - - $674 -
TOTAL RECOMMENDED $16,436 $15,556 $11,780
356,975
kWh
$942
-
kW-mo/yr
$674 $3,040
-
MMBtu
TOTAL IMPLEMENTED $7,077 $5,480 $6,478
196,366
kWh
$599
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs