| Assessment Year | 2025 |
|---|---|
| Principal Product | Treated sewage and food processing waste water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
1,248,000
ft2
|
| Annual Production | 3,345,000,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $702,249 | 8,715,000 |
kWh
|
$0.081 |
| Electricity Demand | $92,755 | 15,232 |
kW-mo/yr
|
$6.09 |
| Electricity Fees | $74,473 | - |
|
- |
| Natural Gas | $205,358 | 12,140 |
MMBtu
|
$16.92 |
| Other Gas | $7,468 | 1 |
MMBtu
|
$7,468.00 |
| TOTAL YEARLY COSTS | $1,082,303 | |||
| RECOMMENDED SAVINGS* | $776,392 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $776,392 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $170,715 | $5,537,300 |
$15,015
186,288
kWh
|
$5,700
-
kW-mo/yr
|
- | $150,000 | |
| 02 | 4.652: Replace existing equipment with more suitable substitutes | $38,542 | $289,575 |
$38,542
478,192
kWh
|
- | - | - | |
| 03 | 4.463: Modify facility to avoid excess maintenance costs | $5,795 | $10,336 | - | - | - | $5,795 | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $399,297 | $329,940 | - | - |
$399,297
-
MMBtu
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $37,086 | $16,198 |
$33,608
416,976
kWh
|
$3,478
-
kW-mo/yr
|
- | - | |
| 06 | 3.8132: Use less toxic and volatile solvent substitutes | $124,957 | $342,000 | - | - | - | $124,957 | |
| TOTAL RECOMMENDED | $776,392 | $6,525,349 |
$87,165
1,081,456
kWh
|
$9,178
-
kW-mo/yr
|
$399,297
-
MMBtu
|
$280,752 | ||
| TOTAL IMPLEMENTED | $776,392 | $6,525,349 |
$87,165
1,081,456
kWh
|
$9,178
-
kW-mo/yr
|
$399,297
-
MMBtu
|
$280,752 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs