ITAC Assessment: UW2507
ITAC logo
ITAC Assessment: UW2507
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Treated sewage and food processing waste water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 1,248,000
ft2
Annual Production 3,345,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $702,249 8,715,000
kWh
Electricity Demand $92,755 15,232
kW-mo/yr
Electricity Fees $74,473 -
Natural Gas $205,358 12,140
MMBtu
Other Gas $7,468 1
MMBtu
TOTAL YEARLY COSTS $1,082,303
RECOMMENDED SAVINGS* $776,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4321: Upgrade obsolete equipment $170,715 $5,537,300 $15,015
186,288
kWh
$5,700
-
kW-mo/yr
- $150,000
02 4.652: Replace existing equipment with more suitable substitutes $38,542 $289,575 $38,542
478,192
kWh
- - -
03 4.463: Modify facility to avoid excess maintenance costs $5,795 $10,336 - - - $5,795
04 2.2414: Use waste heat from hot flue gases to preheat $399,297 $329,940 - - $399,297
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $37,086 $16,198 $33,608
416,976
kWh
$3,478
-
kW-mo/yr
- -
06 3.8132: Use less toxic and volatile solvent substitutes $124,957 $342,000 - - - $124,957
TOTAL RECOMMENDED $776,392 $6,525,349 $87,165
1,081,456
kWh
$9,178
-
kW-mo/yr
$399,297
-
MMBtu
$280,752
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs