Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous services incidental to transportation
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0257 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,573 $3,100
TT0257 #04 Y:2021 Recover waste heat from equipment $4,957 $12,180
TT0257 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,982 $7,100
TT0257 #02 Y:2021 Turn off equipment during breaks, reduce operating time $6,293 -
TT0257 #01 Y:2021 Reduce space conditioning during non-working hours $185,939 $360
TT0255 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $6,140 $7,200
TT0255 #03 Y:2021 Reduce space conditioning during non-working hours $20,336 $24,200
TT0255 #02 Y:2021 Recover waste heat from equipment $32,997 $1,640
TT0255 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $43,816 $1,640
BD0450 #10 Y:2014 Utilize higher efficiency lamps and/or ballasts $322 $143
BD0450 #09 Y:2014 Install occupancy sensors $406 $750
BD0450 #08 Y:2014 Use most efficient type of electric motors $461 $320
BD0450 #07 Y:2014 Use photocell controls $777 $450
BD0450 #06 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,909 $1,025
BD0450 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,148 $2,850
BD0450 #04 Y:2014 Upgrade obsolete equipment $2,486 $20
BD0450 #03 Y:2014 Install compressor air intakes in coolest locations $2,837 $1,000
BD0450 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $16,234 $24,940
BD0450 #01 Y:2014 Use radiant heater for spot heating $19,966 $27,000
SD0429 #06 Y:2010 Clean or color roof to reduce solar load $194 $500