ITAC Assessment: TT0257
ITAC logo
ITAC Assessment: TT0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Space Research and Technology
NAICS 927110: Space Research and Technology
SIC 4789: Transportation Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 6,000
Plant Area 2,500,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,567,358 107,975,377
kWh
Electricity Demand $2,909,273 200,346
kW-mo/yr
Natural Gas $600,534 117,501
MMBtu
Waste Disposal Costs
Water Usage $980,106 237,055
Tgal
TOTAL YEARLY COSTS $9,057,271
RECOMMENDED SAVINGS* $203,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $193,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $185,939 $360 $185,939
4,395,731
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $6,293 - $6,293
148,771
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,982 $7,100 $1,672
39,520
kWh
$3,310
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $4,957 $12,180 $879
20,774
kWh
- $4,078
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,573 $3,100 $528
12,480
kWh
$1,045
-
kW-mo/yr
-
TOTAL RECOMMENDED $203,744 $22,740 $195,311
4,617,276
kWh
$4,355
-
kW-mo/yr
$4,078
-
MMBtu
TOTAL IMPLEMENTED $193,805 $3,460 $192,760
4,556,982
kWh
$1,045
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs