ITAC Assessment: HO0191
ITAC logo
ITAC Assessment: HO0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Paintbrush Handles
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,198 667,937
kWh
Electricity Demand $92,089 4,074
kW-mo/yr
Electricity Fees $7,882 -
Fuel Oil #4 $15,000 3,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,443

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,167 $5,870 $757
12,896
kWh
$1,410
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,826 $120 $1,826
31,067
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $364 $410 $364
6,155
kWh
- - -
04 2.5122: Replace high resistance ducts, pipes, and fittings $875 $400 $875
14,947
kWh
- - -
05 2.7496: Install partitions to reduce size of conditioned space $1,245 $1,500 - - $1,245
-
MMBtu
-
06 4.444: Install system to collect scrap $4,160 $1,320 - - - $4,160
07 3.1191: Change procedures / equipment / operating conditions $1,125 $500 - - - $1,125
08 3.1191: Change procedures / equipment / operating conditions $450 $1,000 - - - $450
09 3.1191: Change procedures / equipment / operating conditions $1,125 $1,000 - - - $1,125
TOTAL RECOMMENDED $13,337 $12,120 $3,822
65,065
kWh
$1,410
-
kW-mo/yr
$1,245
-
MMBtu
$6,860
TOTAL IMPLEMENTED $6,443 $7,890 $3,458
58,910
kWh
$1,410
-
kW-mo/yr
- $1,575
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs