ITAC Assessment: TT0255
ITAC logo
ITAC Assessment: TT0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Space Research and Technology
NAICS 927110: Space Research and Technology
SIC 4789: Transportation Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 6,000
Plant Area 2,500,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,567,358 107,975,377
kWh
Electricity Demand $2,909,273 200,346
kW-mo/yr
Electricity Fees $2,156,735 -
Natural Gas $600,534 117,501
MMBtu
Waste Disposal Costs
Water Usage $980,106 237,055
Tgal
TOTAL YEARLY COSTS $11,214,006
RECOMMENDED SAVINGS* $103,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,816 $1,640 $43,816
1,035,849
kWh
-
02 2.2437: Recover waste heat from equipment $32,997 $1,640 $32,997
780,078
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $20,336 $24,200 $20,336
480,751
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,140 $7,200 $2,376
56,160
kWh
$3,764
-
kW-mo/yr
TOTAL RECOMMENDED $103,289 $34,680 $99,525
2,352,838
kWh
$3,764
-
kW-mo/yr
TOTAL IMPLEMENTED $70,292 $33,040 $66,528
1,572,760
kWh
$3,764
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs