ITAC Assessment: CO0227
ITAC logo
ITAC Assessment: CO0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ALUMINUM SHEET
NAICS
n/a
SIC 3353: Aluminum Sheet, Plate, and Foil
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area
n/a
Annual Production 71,000,000
lb
Production Hrs. Annual 8,688
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,092,513 28,852,580
kWh
Natural Gas $1,595,591 459,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $632 $275 $632
16,706
kWh
-
02 2.2443: Re-use or recycle hot or cold process exhaust air $7,150 $3,500 - $7,150
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,890 $4,720 $2,890
76,202
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,080 $23,725 $13,080
345,252
kWh
-
05 2.4133: Use most efficient type of electric motors $1,897 $3,595 $1,897
99,648
kWh
-
06 2.4131: Size electric motors for peak operating efficiency $4,500 $20,650 $4,500
118,699
kWh
-
TOTAL RECOMMENDED $30,149 $56,465 $22,999
656,507
kWh
$7,150
-
MMBtu
TOTAL IMPLEMENTED $30,149 $56,465 $22,999
656,507
kWh
$7,150
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs