Assessment Year | 2015 |
---|---|
Principal Product | Extruded Aluminum Tube and Cans |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 139 |
Plant Area |
220,000
ft2
|
Annual Production | 152,611,568
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $503,823 | 8,199,327 |
kWh
|
$0.061 |
Electricity Demand | $117,752 | 15,781 |
kW-mo/yr
|
$7.46 |
Electricity Fees | $20,031 | - |
|
- |
Natural Gas | $235,091 | 33,299 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,575 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $911 | $290 | - | - |
$911
-
MMBtu
|
- | |
02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $14,085 | $9,000 | - | - |
$14,085
-
MMBtu
|
- | |
03 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $18,758 | $63,200 | - | - |
$18,758
-
MMBtu
|
- | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,550 | $15,020 |
$14,323
233,280
kWh
|
$7,251
-
kW-mo/yr
|
$(-7,024.0)
-
MMBtu
|
- | |
05 | 2.7131: Add area lighting switches | $909 | $785 |
$909
14,801
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $2,923 | $7,872 | - | - | - | $2,923 | |
07 | 2.7135: Install occupancy sensors | $1,722 | $193 |
$1,371
22,334
kWh
|
$276
-
kW-mo/yr
|
- | $75 | |
08 | 2.4321: Upgrade obsolete equipment | $1,302 | $746 |
$974
15,900
kWh
|
$328
-
kW-mo/yr
|
- | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $716 | - |
$716
11,656
kWh
|
- | - | - | |
10 | 2.4225: Install common header on compressors | $4,650 | $2,950 |
$3,711
60,447
kWh
|
$939
-
kW-mo/yr
|
- | - | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,700 | $1,700 |
$14,700
239,897
kWh
|
- | - | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $1,063 | $3,260 |
$997
16,240
kWh
|
$66
-
kW-mo/yr
|
- | - | |
13 | 2.4239: Eliminate or reduce compressed air usage | $21,138 | $12,000 |
$16,923
275,616
kWh
|
$4,215
-
kW-mo/yr
|
- | - | |
14 | 2.4239: Eliminate or reduce compressed air usage | $7,224 | $13,658 |
$5,739
93,473
kWh
|
$1,485
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $104,651 | $130,674 |
$60,363
983,644
kWh
|
$14,560
-
kW-mo/yr
|
$26,730
-
MMBtu
|
$2,998 | ||
TOTAL IMPLEMENTED | $44,575 | $20,849 |
$38,676
630,434
kWh
|
$5,824
-
kW-mo/yr
|
- | $75 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs