ITAC Assessment: UD0834
ITAC logo
ITAC Assessment: UD0834
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Gray and Ductile Castings
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 40,000
ft2
Annual Production 1,100
ton
Production Hrs. Annual 2,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,815 549,455
kWh
Electricity Demand $28,748 614
kW-mo/yr
Electricity Fees $4,964 -
Natural Gas $26,565 2,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,364 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $688 $3,315 $519
6,024
kWh
$137
-
kW-mo/yr
- $32
02 2.7142: Utilize higher efficiency lamps and/or ballasts $251 $860 $185
2,153
kWh
$49
-
kW-mo/yr
- $17
03 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $665 $158
1,835
kWh
$42
-
kW-mo/yr
- $(-3.0)
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $408 $25 $323
3,750
kWh
$85
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $211 $25 $167
1,935
kWh
$44
-
kW-mo/yr
- -
06 2.6242: Minimize operation of equipment maintained in standby condition $3,027 $6,500 $2,624
30,472
kWh
$403
-
kW-mo/yr
- -
07 2.7231: Use radiant heater for spot heating $6,582 $2,349 - - $6,582
-
MMBtu
-
TOTAL RECOMMENDED $11,364 $13,739 $3,976
46,169
kWh
$760
-
kW-mo/yr
$6,582
-
MMBtu
$46
TOTAL IMPLEMENTED $7,398 $3,064 $648
7,520
kWh
$171
-
kW-mo/yr
$6,582
-
MMBtu
$(-3.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs