| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| KS2311 #03 Y:2023 | 03 | 2023 | Insulate feedwater tank | $4,841 | $4,104 | |
| KS2311 #02 Y:2023 | 02 | 2023 | Repair faulty insulation in furnaces, boilers, etc | $19,596 | $10,708 | |
| KS2311 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,574 | $6,440 | |
| UA0213 #06 Y:2019 | 06 | 2019 | Use cooling tower or economizer to replace chiller cooling | $15,399 | $4,370 | |
| UA0213 #05 Y:2019 | 05 | 2019 | Use waste heat from hot flue gases to preheat | $6,067 | $30,000 | |
| UA0213 #04 Y:2019 | 04 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $7,549 | $1,294 | |
| UA0213 #03 Y:2019 | 03 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $16,098 | $4,895 | |
| UA0213 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $8,647 | $100 | |
| UA0213 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $22,484 | $31,859 | |
| OK1011 #09 Y:2019 | 09 | 2019 | Adjust / maintain fork lift trucks for most efficient operation | $1,628 | - | |
| OK1011 #08 Y:2019 | 08 | 2019 | Install smaller boiler (increase high fire duty cycle) | $18,744 | $35,736 | |
| OK1011 #07 Y:2019 | 07 | 2019 | Install set-back timers | $480 | $240 | |
| OK1011 #06 Y:2019 | 06 | 2019 | Insulate bare equipment | $5,110 | $63 | |
| OK1011 #05 Y:2019 | 05 | 2019 | Optimize plant power factor | $13,080 | $57,161 | |
| OK1011 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $43,176 | $71,250 | |
| OK1011 #03 Y:2019 | 03 | 2019 | Utilize higher efficiency lamps and/or ballasts | $3,937 | $15,573 | |
| OK1011 #02 Y:2019 | 02 | 2019 | Reduce the pressure of compressed air to the minimum required | $5,528 | $8,106 | |
| OK1011 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,499 | $1,898 | |
| BD0438 #16 Y:2013 | 16 | 2013 | Install occupancy sensors | $159 | $32 | |
| BD0438 #15 Y:2013 | 15 | 2013 | Install / repair insulation on steam lines | $286 | $325 |