Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Linoleum, asphalted-felt-base, and other hard surface floor coverings, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2311 #03 Y:2023 Insulate feedwater tank $4,841 $4,104
KS2311 #02 Y:2023 Repair faulty insulation in furnaces, boilers, etc $19,596 $10,708
KS2311 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $12,574 $6,440
UA0213 #06 Y:2019 Use cooling tower or economizer to replace chiller cooling $15,399 $4,370
UA0213 #05 Y:2019 Use waste heat from hot flue gases to preheat $6,067 $30,000
UA0213 #04 Y:2019 Utilize energy-efficient belts and other improved mechanisms $7,549 $1,294
UA0213 #03 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $16,098 $4,895
UA0213 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $8,647 $100
UA0213 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $22,484 $31,859
OK1011 #09 Y:2019 Adjust / maintain fork lift trucks for most efficient operation $1,628 -
OK1011 #08 Y:2019 Install smaller boiler (increase high fire duty cycle) $18,744 $35,736
OK1011 #07 Y:2019 Install set-back timers $480 $240
OK1011 #06 Y:2019 Insulate bare equipment $5,110 $63
OK1011 #05 Y:2019 Optimize plant power factor $13,080 $57,161
OK1011 #04 Y:2019 Utilize higher efficiency lamps and/or ballasts $43,176 $71,250
OK1011 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $3,937 $15,573
OK1011 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $5,528 $8,106
OK1011 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $7,499 $1,898
BD0438 #16 Y:2013 Install occupancy sensors $159 $32
BD0438 #15 Y:2013 Install / repair insulation on steam lines $286 $325