ITAC Assessment: OK1011
ITAC logo
ITAC Assessment: OK1011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Flooring
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 500,000
ft2
Annual Production 28,171
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $804,368 15,849,600
kWh
Electricity Demand $545,443 47,333
kW-mo/yr
Electricity Fees $19,925 -
Natural Gas $410,380 144,500
MMBtu
LPG $5,529 322
MMBtu
Other Gas $20,047 1
MMBtu
Waste Disposal Costs
Water Usage $38,091 5,368
Tgal
Water Disposal $4,480 1,342
Tgal
TOTAL YEARLY COSTS $1,848,263
RECOMMENDED SAVINGS* $99,182 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,499 $1,898 $7,499
147,040
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,528 $8,106 $5,528
108,385
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,937 $15,573 $3,937
77,203
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $43,176 $71,250 $30,112
590,436
kWh
$13,064
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $13,080 $57,161 - - $13,080 -
06 2.2511: Insulate bare equipment $5,110 $63 - - - $5,110
-
MMBtu
07 2.6232: Install set-back timers $480 $240 $443
8,687
kWh
- - $37
-
MMBtu
08 2.1223: Install smaller boiler (increase high fire duty cycle) $18,744 $35,736 - - - $18,744
-
MMBtu
09 2.8227: Adjust / maintain fork lift trucks for most efficient operation $1,628 - $594
11,646
kWh
$1,034
-
kW-mo/yr
- -
TOTAL RECOMMENDED $99,182 $190,027 $48,113
943,397
kWh
$14,098
-
kW-mo/yr
$13,080 $23,891
-
MMBtu
TOTAL IMPLEMENTED $56,240 $88,721 $42,142
826,325
kWh
$14,098
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs