Assessment Year | 2019 |
---|---|
Principal Product | Flooring |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3996: Linoleum, Asphalted-Felt-Base, and Other Hard Surface Floor Coverings, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
500,000
ft2
|
Annual Production | 28,171
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $804,368 | 15,849,600 |
kWh
|
$0.051 | |
Electricity Demand | $545,443 | 47,333 |
kW-mo/yr
|
$11.52 | |
Electricity Fees | $19,925 | - |
|
- | |
Natural Gas | $410,380 | 144,500 |
MMBtu
|
$2.84 | |
LPG | $5,529 | 322 |
MMBtu
|
$17.17 | |
Other Gas | $20,047 | 1 |
MMBtu
|
$20,047.00 | |
Waste Disposal Costs | |||||
Water Usage | $38,091 | 5,368 |
Tgal
|
$7.10 | |
Water Disposal | $4,480 | 1,342 |
Tgal
|
$3.34 | |
TOTAL YEARLY COSTS | $1,848,263 | ||||
RECOMMENDED SAVINGS* | $99,182 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $56,240 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,499 | $1,898 |
$7,499
147,040
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,528 | $8,106 |
$5,528
108,385
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,937 | $15,573 |
$3,937
77,203
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $43,176 | $71,250 |
$30,112
590,436
kWh
|
$13,064
-
kW-mo/yr
|
- | - | |
05 | 2.3212: Optimize plant power factor | $13,080 | $57,161 | - | - | $13,080 | - | |
06 | 2.2511: Insulate bare equipment | $5,110 | $63 | - | - | - |
$5,110
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $480 | $240 |
$443
8,687
kWh
|
- | - |
$37
-
MMBtu
|
|
08 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $18,744 | $35,736 | - | - | - |
$18,744
-
MMBtu
|
|
09 | 2.8227: Adjust / maintain fork lift trucks for most efficient operation | $1,628 | - |
$594
11,646
kWh
|
$1,034
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $99,182 | $190,027 |
$48,113
943,397
kWh
|
$14,098
-
kW-mo/yr
|
$13,080 |
$23,891
-
MMBtu
|
||
TOTAL IMPLEMENTED | $56,240 | $88,721 |
$42,142
826,325
kWh
|
$14,098
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs