Assessment Year | 1996 |
---|---|
Principal Product | Motor Vehicle Parts and Assembly |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
120,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 6,336
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $107,109 | 3,618,406 |
kWh
|
$0.030 |
Electricity Demand | $143,410 | 8,544 |
kW-mo/yr
|
$16.78 |
Electricity Fees | $(-4,738.0) | - |
|
- |
Natural Gas | $20,979 | 4,585 |
MMBtu
|
$4.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,588 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,904 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,113 | $1,780 |
$1,105
36,928
kWh
|
$1,008
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,516 | $61,663 |
$11,759
397,421
kWh
|
$12,757
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,084 | $810 |
$1,091
36,928
kWh
|
$993
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,091 | $450 |
$6,348
138,628
kWh
|
$3,743
-
kW-mo/yr
|
- | |
05 | 2.4237: Substitute compressed air cooling with water or air cooling | $1,700 | $800 |
$989
24,033
kWh
|
$711
-
kW-mo/yr
|
- | |
06 | 3.3133: Use other waste concentration methods | $3,084 | - | - | - |
$3,084
-
gal
|
|
TOTAL RECOMMENDED | $43,588 | $65,503 |
$21,292
633,938
kWh
|
$19,212
-
kW-mo/yr
|
$3,084
-
gal
|
||
TOTAL IMPLEMENTED | $13,904 | $3,030 |
$8,442
199,589
kWh
|
$5,462
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs