Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC X-ray apparatus and tubes and related irradiation apparatus
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0241 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,075 $5,000
DL0241 #02 Y:2024 Chill water to the highest temperature possible $7,985 $4,420
DL0241 #01 Y:2024 Recover waste heat from equipment $30,655 $117,000
UU0109 #06 Y:2006 Use properly designed and sized hvac equipment $32,510 $249,000
UU0109 #05 Y:2006 Turn off equipment when not in use $3,360 $2,960
UU0109 #04 Y:2006 Reduce the pressure of compressed air to the minimum required $1,040 $90
UU0109 #03 Y:2006 Eliminate or reduce compressed air usage $3,730 $970
UU0109 #02 Y:2006 Use demand controller or load shedder $24,880 $20,000
UU0109 #01 Y:2006 Optimize plant power factor $1,800 $2,220
AM0503 #07 Y:2005 Use synthetic lubricant $256 -
AM0503 #06 Y:2005 Reuse rags until completely soiled $880 -
AM0503 #05 Y:2005 Reduce the pressure of compressed air to the minimum required $930 $27
AM0503 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,320 $300
AM0503 #03 Y:2005 Optimize plant power factor $6,550 $17,100
AM0503 #02 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,600 $500
AM0503 #01 Y:2005 Lower light fixtures in high ceiling areas $16,230 $33,000
WI0390 #09 Y:2001 Install compressor air intakes in coolest locations $161 $640
WI0390 #08 Y:2001 Regrind, reuse, or sell scrap plastic parts $397 -
WI0390 #07 Y:2001 Reduce space conditioning during non-working hours $481 -
WI0390 #06 Y:2001 Utilize energy-efficient belts and other improved mechanisms $138 -