| Assessment Year | 2024 |
|---|---|
| Principal Product | components for mammography and other diagnostic equipment |
| NAICS | 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing |
| SIC | 3844: X-Ray Apparatus and Tubes and Related Irradiation Apparatus |
| Sales Range | $100 M to 500M |
| # of Employees | 375 |
| Plant Area |
195,000
ft2
|
| Annual Production | 1,000
units
|
| Production Hrs. Annual | 5,070
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $487,283 | 6,436,351 |
kWh
|
$0.076 |
| Electricity Demand | $70,180 | 11,590 |
kW-mo/yr
|
$6.06 |
| Electricity Fees | $14,939 | - |
|
- |
| Natural Gas | $90,322 | 9,149 |
MMBtu
|
$9.87 |
| TOTAL YEARLY COSTS | $662,724 | |||
| RECOMMENDED SAVINGS* | $41,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,060 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $30,655 | $117,000 |
$14,626
187,515
kWh
|
$16,029
-
MMBtu
|
|
| 02 | 2.2625: Chill water to the highest temperature possible | $7,985 | $4,420 |
$7,985
102,374
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,075 | $5,000 |
$3,075
39,420
kWh
|
- | |
| TOTAL RECOMMENDED | $41,715 | $126,420 |
$25,686
329,309
kWh
|
$16,029
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,060 | $9,420 |
$11,060
141,794
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs