| Assessment Year | 2012 |
|---|---|
| Principal Product | Aluminum Master Alloys, Strontium Metal |
| NAICS | 331524: Aluminum Foundries (except Die-Casting) |
| SIC | 3365: Aluminum Foundries |
| Sales Range | $10 M to 50M |
| # of Employees | 51 |
| Plant Area |
92,300
ft2
|
| Annual Production | 24,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $229,281 | 8,327,280 |
kWh
|
$0.028 |
| Electricity Demand | $253,615 | 24,554 |
kW-mo/yr
|
$10.33 |
| Electricity Fees | $(-63,761.0) | - |
|
- |
| Natural Gas | $222,025 | 49,944 |
MMBtu
|
$4.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $56,308 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $12,859 | $11,250 |
$7,467
271,544
kWh
|
$5,392
-
kW-mo/yr
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $940 | $420 |
$393
14,279
kWh
|
$547
-
kW-mo/yr
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,299 | $7,500 |
$3,973
133,551
kWh
|
$3,326
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,517 | $30,800 |
$4,732
172,100
kWh
|
$5,785
-
kW-mo/yr
|
- | |
| 05 | 2.2511: Insulate bare equipment | $10,493 | $5,984 | - | - |
$10,493
-
MMBtu
|
|
| 06 | 2.2442: Preheat combustion air with waste heat | $14,200 | $39,850 | - | - |
$14,200
-
MMBtu
|
|
| TOTAL RECOMMENDED | $56,308 | $95,804 |
$16,565
591,474
kWh
|
$15,050
-
kW-mo/yr
|
$24,693
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs