ITAC Assessment: OR0434
ITAC logo
ITAC Assessment: OR0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Folding handtools, Knives
NAICS 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing
SIC 2134:
Sales Range $50
M
to 100
M
# of Employees 254
Plant Area 77,862
ft2
Annual Production 1,570,000
pieces
Production Hrs. Annual 4,916
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,743 3,858,320
kWh
Electricity Demand $53,116 11,040
kW-mo/yr
Electricity Fees $1,381 -
Natural Gas $45,235 6,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings Administrative Changes Savings
01 2.8211: Consolidate freight shipments and/or deliveries $78,000 $44,800 n/a - - - $74,200 $3,800
02 2.6242: Minimize operation of equipment maintained in standby condition $32,000 $1,500 - - $32,000
-
MMBtu
- -
03 2.4224: Upgrade controls on compressors $12,600 $5,000 $9,300
206,000
kWh
$3,300
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $5,850 $8,350 $4,140
91,400
kWh
$1,710
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $590 - $390
8,700
kWh
$200
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $129,040 $59,650 $13,830
306,100
kWh
$5,210
-
kW-mo/yr
$32,000
-
MMBtu
$74,200 $3,800
TOTAL IMPLEMENTED $18,450 $13,350 $13,440
297,400
kWh
$5,010
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs