Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Orthopedic, prosthetic, and surgical appliances and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0260 #06 Y:2024 Utilize higher efficiency lamps and/or ballasts $489 $1,818
UU0260 #05 Y:2024 Turn off equipment during breaks, reduce operating time $726 $3,000
UU0260 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,557 $6,277
UU0260 #03 Y:2024 Eliminate or reduce compressed air usage $4,696 $8,277
UU0260 #02 Y:2024 Reschedule plant operations or reduce load to avoid peaks $10,585 $5,800
UU0260 #01 Y:2024 Use solar heat to make electricty $27,825 $247,680
UL2402 #06 Y:2024 Use solar heat to make electricty $147,025 $1,560,993
UL2402 #05 Y:2024 Use outside cold water source as a supply of cooling water $176,163 $90,792
UL2402 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $5,801 $3,150
UL2402 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $677 -
UL2402 #02 Y:2024 Reduce illumination to minimum necessary levels $2,889 -
UL2402 #01 Y:2024 Install spectral reflectors / delamp $1,664 $1,130
UU0209 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,279 $1,600
UU0209 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,311 $900
UU0209 #05 Y:2022 Use or replace with energy efficient substitutes $1,347 $1,395
UU0209 #04 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,767 $6,406
UU0209 #03 Y:2022 Lower temperature during the winter season and vice-versa $2,247 $850
UU0209 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $4,206 $5,920
UU0209 #01 Y:2022 Reduce the pressure of compressed air to the minimum required $9,593 $20,930
UF0584 #10 Y:2022 Level zero – install control systems for existing equipment $68,493 -