Assessment Year | 2022 |
---|---|
Principal Product | Surgical implants and instruments |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
60,000
ft2
|
Annual Production | 265,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,164 | 1,785,600 |
kWh
|
$0.036 |
Electricity Demand | $72,323 | 4,445 |
kW-mo/yr
|
$16.27 |
Electricity Fees | $32,134 | - |
|
- |
Natural Gas | $13,899 | 1,694 |
MMBtu
|
$8.21 |
TOTAL YEARLY COSTS | $182,521 | |||
RECOMMENDED SAVINGS* | $21,750 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,143 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,593 | $20,930 |
$3,118
86,609
kWh
|
$6,475
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,206 | $5,920 |
$3,998
111,360
kWh
|
$208
-
kW-mo/yr
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,247 | $850 |
$2,247
62,582
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,767 | $6,406 |
$1,077
29,924
kWh
|
$689
-
kW-mo/yr
|
|
05 | 2.4322: Use or replace with energy efficient substitutes | $1,347 | $1,395 |
$1,347
37,492
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,311 | $900 |
$809
22,470
kWh
|
$502
-
kW-mo/yr
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,279 | $1,600 |
$842
23,455
kWh
|
$437
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $21,750 | $38,001 |
$13,438
373,892
kWh
|
$8,312
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $8,143 | $9,815 |
$6,996
194,777
kWh
|
$1,147
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs