ITAC Assessment: UU0209
ITAC logo
ITAC Assessment: UU0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Surgical implants and instruments
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 265,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,164 1,785,600
kWh
Electricity Demand $72,323 4,445
kW-mo/yr
Electricity Fees $32,134 -
Natural Gas $13,899 1,694
MMBtu
TOTAL YEARLY COSTS $182,521
RECOMMENDED SAVINGS* $21,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,593 $20,930 $3,118
86,609
kWh
$6,475
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,206 $5,920 $3,998
111,360
kWh
$208
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $2,247 $850 $2,247
62,582
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,767 $6,406 $1,077
29,924
kWh
$689
-
kW-mo/yr
05 2.4322: Use or replace with energy efficient substitutes $1,347 $1,395 $1,347
37,492
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,311 $900 $809
22,470
kWh
$502
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,279 $1,600 $842
23,455
kWh
$437
-
kW-mo/yr
TOTAL RECOMMENDED $21,750 $38,001 $13,438
373,892
kWh
$8,312
-
kW-mo/yr
TOTAL IMPLEMENTED $8,143 $9,815 $6,996
194,777
kWh
$1,147
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs