ITAC Assessment: UF0584
ITAC logo
ITAC Assessment: UF0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Surgical Implants (Allografts)
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 65,000
ft2
Annual Production 13,849
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $688,493 10,259,600
kWh
Electricity Demand $138,902 18,860
kW-mo/yr
Electricity Fees $200,453 -
Waste Disposal Costs
Water Usage $15,283 4,403,690
Tgal
Water Disposal $41,703 593,600
Tgal
TOTAL YEARLY COSTS $1,084,834
RECOMMENDED SAVINGS* $903,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,348

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $544,931 $1,699,000 $656,552
9,799,282
kWh
$88,380
-
kW-mo/yr
$(-115,001.0)
-
MMBtu
$(-85,000.0)
02 2.9114: Use solar heat to make electricty $73,209 $322,608 $44,927
670,555
kWh
$28,282
-
kW-mo/yr
- -
03 2.3191: Use demand controller or load shedder $57,843 $55,197 $48,118
718,172
kWh
$9,725
-
kW-mo/yr
- -
04 2.7292: Lower ceiling to reduce conditioned space $56,623 $65,000 $56,623
845,126
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $10,250 $160 $10,250
152,989
kWh
- - -
06 2.2623: Minimize condenser cooling water temperature $10,226 $7,600 $10,226
152,625
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,855 $40,432 $7,204
107,521
kWh
$2,651
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $3,261 $3,420 $2,515
37,537
kWh
$746
-
kW-mo/yr
- -
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $68,739 $10,000 $68,739
1,025,960
kWh
- - -
10 4.661: Level zero – install control systems for existing equipment $68,493 - - - - $68,493
TOTAL RECOMMENDED $903,430 $2,203,417 $905,154
13,509,767
kWh
$129,784
-
kW-mo/yr
$(-115,001.0)
-
MMBtu
$(-16,507.0)
TOTAL IMPLEMENTED $78,348 $40,432 $7,204
107,521
kWh
$2,651
-
kW-mo/yr
- $68,493
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs