| Assessment Year | 2024 |
|---|---|
| Principal Product | Hard Hats and Safety Equipment |
| NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
138,000
ft2
|
| Annual Production | 1,400,000
units
|
| Production Hrs. Annual | 3,060
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $174,770 | 5,223,000 |
kWh
|
$0.033 |
| Electricity Demand | $253,344 | 13,345 |
kW-mo/yr
|
$18.98 |
| Electricity Fees | $69,099 | - |
|
- |
| Natural Gas | $38,250 | 3,822 |
MMBtu
|
$10.01 |
| TOTAL YEARLY COSTS | $535,463 | |||
| RECOMMENDED SAVINGS* | $334,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7144: Install spectral reflectors / delamp | $1,664 | $1,130 |
$449
13,410
kWh
|
$1,215
-
kW-mo/yr
|
|
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $2,889 | - |
$823
24,598
kWh
|
$2,066
-
kW-mo/yr
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $677 | - |
$677
20,223
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,801 | $3,150 |
$5,801
173,362
kWh
|
- | |
| 05 | 2.2692: Use outside cold water source as a supply of cooling water | $176,163 | $90,792 |
$98,162
2,933,572
kWh
|
$78,001
-
kW-mo/yr
|
|
| 06 | 2.9114: Use solar heat to make electricty | $147,025 | $1,560,993 |
$70,153
2,094,129
kWh
|
$76,872
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $334,219 | $1,656,065 |
$176,065
5,259,294
kWh
|
$158,154
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs