Assessment Year | 2024 |
---|---|
Principal Product | Hard Hats and Safety Equipment |
NAICS | 339113: Surgical Appliance and Supplies Manufacturing |
SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
138,000
ft2
|
Annual Production | 1,400,000
units
|
Production Hrs. Annual | 3,060
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,770 | 5,223,000 |
kWh
|
$0.033 |
Electricity Demand | $253,344 | 13,345 |
kW-mo/yr
|
$18.98 |
Electricity Fees | $69,099 | - |
|
- |
Natural Gas | $38,250 | 3,822 |
MMBtu
|
$10.01 |
TOTAL YEARLY COSTS | $535,463 | |||
RECOMMENDED SAVINGS* | $334,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $1,664 | $1,130 |
$449
13,410
kWh
|
$1,215
-
kW-mo/yr
|
|
02 | 2.7111: Reduce illumination to minimum necessary levels | $2,889 | - |
$823
24,598
kWh
|
$2,066
-
kW-mo/yr
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $677 | - |
$677
20,223
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,801 | $3,150 |
$5,801
173,362
kWh
|
- | |
05 | 2.2692: Use outside cold water source as a supply of cooling water | $176,163 | $90,792 |
$98,162
2,933,572
kWh
|
$78,001
-
kW-mo/yr
|
|
06 | 2.9114: Use solar heat to make electricty | $147,025 | $1,560,993 |
$70,153
2,094,129
kWh
|
$76,872
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $334,219 | $1,656,065 |
$176,065
5,259,294
kWh
|
$158,154
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs