Assessment Year | 2004 |
---|---|
Principal Product | Stainless Steel Punps |
NAICS | 333911: Pump and Pumping Equipment Manufacturing |
SIC | 3561: Pumps and Pumping Equipment |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
100,000
ft2
|
Annual Production | 5,500
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,049 | 926,810 |
kWh
|
$0.052 |
Electricity Demand | $32,039 | 3,134 |
kW-mo/yr
|
$10.22 |
Electricity Fees | $4,202 | - |
|
- |
Natural Gas | $11,150 | 1,350 |
MMBtu
|
$8.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $938 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,743 | - | - |
$10,743
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,524 | $855 |
$2,841
51,940
kWh
|
$1,683
-
kW-mo/yr
|
- | |
03 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $2,765 | $605 |
$1,517
27,734
kWh
|
$1,248
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,817 | $433 |
$1,817
33,232
kWh
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $923 | - | - | - |
$923
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $938 | - |
$508
9,284
kWh
|
$430
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $582 | - |
$365
6,684
kWh
|
$217
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $22,292 | $1,893 |
$7,048
128,874
kWh
|
$14,321
-
kW-mo/yr
|
$923
-
MMBtu
|
||
TOTAL IMPLEMENTED | $938 | - |
$508
9,284
kWh
|
$430
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs