Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Surgical, medical, and dental instruments and supplies
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0151 #01 Y:1998 Eliminate leaks in inert gas and compressed air lines/ valves $1,157 $600
NC0142 #09 Y:1998 Lease / purchase baler; sell cardboard to recycler $75 -
NC0142 #08 Y:1998 Contract a wood pallet recycling company $375 $200
NC0142 #07 Y:1998 Chill water to the highest temperature possible $2,435 $10
NC0142 #06 Y:1998 Utilize higher efficiency lamps and/or ballasts $7,279 $31,754
NC0142 #05 Y:1998 Utilize a less expensive cooling method $2,977 $1,448
NC0142 #04 Y:1998 Use / purchase optimum sized compressor $2,769 $9,000
NC0142 #03 Y:1998 Analyze flue gas for proper air/fuel ratio $1,688 $1,200
NC0142 #02 Y:1998 Reschedule plant operations or reduce load to avoid peaks $4,239 -
NC0142 #01 Y:1998 Install timers and/or thermostats $2,463 $1,050
AT0050 #05 Y:1986 Reduce ventilation air $8,542 $203
AT0050 #04 Y:1986 Recover waste heat from equipment $361 $300
AT0050 #03 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $14,822 $20,000
AT0050 #02 Y:1986 Utilize outside air instead of conditioned air for drying $6,892 $1,700
AT0050 #01 Y:1986 Reduce the pressure of compressed air to the minimum required $859 $400
TN0271 #07 Y:1985 Reduce the pressure of compressed air to the minimum required $148 -
TN0271 #06 Y:1985 Turn off equipment during breaks, reduce operating time $185 $170
TN0271 #05 Y:1985 Utilize higher efficiency lamps and/or ballasts $203 $210
TN0271 #04 Y:1985 Install / repair insulation on condensate lines $267 $100
TN0271 #03 Y:1985 Use minimum steam operating pressure $645 -