ITAC Assessment: NC0151
ITAC logo
ITAC Assessment: NC0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product scissors and medical instruments
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 56,975
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,148 2,572,978
kWh
Electricity Demand $56,032 7,722
kW-mo/yr
Electricity Fees $4,702 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,157 $600 $752
24,326
kWh
$405
-
kW-mo/yr
- - - -
02 2.7232: Replace existing hvac unit with high efficiency model $33,411 $132,700 $20,695
667,644
kWh
$12,716
-
kW-mo/yr
- - - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $401 $1,500 $210
6,741
kWh
$191
-
kW-mo/yr
- - - -
04 2.2692: Use outside cold water source as a supply of cooling water $700 $2,100 $259
8,499
kWh
$441
-
kW-mo/yr
- - - -
05 2.4226: Use / purchase optimum sized compressor $5,290 $3,000 $2,088
72,098
kWh
$1,202
-
kW-mo/yr
- - $2,000 -
06 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $3,822 $15,000 - - - - - $3,822
07 3.3127: Use adsorption, ion exchange to remove contaminants $11,500 $45,000 - - $11,500
-
lb
- - -
08 3.3131: Use evaporation to concentrate material $4,721 $16,000 $(-620.0)
(-19,930)
kWh
- $6,541
-
lb
$(-700.0) $(-500.0) -
TOTAL RECOMMENDED $61,002 $215,900 $23,384
759,378
kWh
$14,955
-
kW-mo/yr
$18,041
-
lb
$(-700.0) $1,500 $3,822
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs