Assessment Year | 1998 |
---|---|
Principal Product | scissors and medical instruments |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 160 |
Plant Area |
56,975
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,148 | 2,572,978 |
kWh
|
$0.038 |
Electricity Demand | $56,032 | 7,722 |
kW-mo/yr
|
$7.26 |
Electricity Fees | $4,702 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,002 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,157 | $600 |
$752
24,326
kWh
|
$405
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7232: Replace existing hvac unit with high efficiency model | $33,411 | $132,700 |
$20,695
667,644
kWh
|
$12,716
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $401 | $1,500 |
$210
6,741
kWh
|
$191
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2692: Use outside cold water source as a supply of cooling water | $700 | $2,100 |
$259
8,499
kWh
|
$441
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $5,290 | $3,000 |
$2,088
72,098
kWh
|
$1,202
-
kW-mo/yr
|
- | - | $2,000 | - | |
06 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $3,822 | $15,000 | - | - | - | - | - | $3,822 | |
07 | 3.3127: Use adsorption, ion exchange to remove contaminants | $11,500 | $45,000 | - | - |
$11,500
-
lb
|
- | - | - | |
08 | 3.3131: Use evaporation to concentrate material | $4,721 | $16,000 |
$(-620.0)
(-19,930)
kWh
|
- |
$6,541
-
lb
|
$(-700.0) | $(-500.0) | - | |
TOTAL RECOMMENDED | $61,002 | $215,900 |
$23,384
759,378
kWh
|
$14,955
-
kW-mo/yr
|
$18,041
-
lb
|
$(-700.0) | $1,500 | $3,822 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs