ITAC Assessment: NC0142
ITAC logo
ITAC Assessment: NC0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Closures for surgical prcedures
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 145,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,747 8,747,655
kWh
Electricity Demand $206,345 21,905
kW-mo/yr
Electricity Fees $7,737 -
Natural Gas $68,910 20,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,179

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7261: Install timers and/or thermostats $2,463 $1,050 $2,463
95,838
kWh
- - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,239 - - $4,239
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,688 $1,200 - - $1,688
-
MMBtu
-
04 2.4226: Use / purchase optimum sized compressor $2,769 $9,000 $2,769
107,855
kWh
- - -
05 2.2628: Utilize a less expensive cooling method $2,977 $1,448 $1,718
66,823
kWh
$1,259
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,279 $31,754 $3,831
149,179
kWh
$3,448
-
kW-mo/yr
- -
07 2.2625: Chill water to the highest temperature possible $2,435 $10 $1,621
63,013
kWh
$814
-
kW-mo/yr
- -
08 3.5316: Contract a wood pallet recycling company $375 $200 - - - $375
-
lb
09 3.5315: Lease / purchase baler; sell cardboard to recycler $75 - - - - $75
-
lb
TOTAL RECOMMENDED $24,300 $44,662 $12,402
482,708
kWh
$9,760
-
kW-mo/yr
$1,688
-
MMBtu
$450
-
lb
TOTAL IMPLEMENTED $18,179 $34,014 $7,915
308,030
kWh
$8,501
-
kW-mo/yr
$1,688
-
MMBtu
$75
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings