315
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Measuring and controlling devices, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0637 #07 Y:2013 | 07 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $315 | $350 | |
| AM0637 #06 Y:2013 | 06 | 2013 | Reduce the pressure of compressed air to the minimum required | $960 | $15 | |
| AM0637 #05 Y:2013 | 05 | 2013 | Eliminate or reduce compressed air usage | $1,500 | $260 | |
| AM0637 #04 Y:2013 | 04 | 2013 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,790 | $4,250 | |
| AM0637 #03 Y:2013 | 03 | 2013 | Install skylights | $4,110 | $6,350 | |
| AM0637 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $10,130 | $5,300 | |
| AM0637 #01 Y:2013 | 01 | 2013 | Convert to high volume low pressure (hvlp) paint guns | $14,820 | $400 | |
| SD0439 #06 Y:2011 | 06 | 2011 | Recover waste heat from equipment | $163,156 | $302,600 | |
| SD0439 #05 Y:2011 | 05 | 2011 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $110,990 | $185,200 | |
| SD0439 #04 Y:2011 | 04 | 2011 | Use cooling tower or economizer to replace chiller cooling | $5,851 | $8,326 | |
| SD0439 #03 Y:2011 | 03 | 2011 | Use adjustable frequency drive or multiple speed motors on existing system | $16,510 | $5,375 | |
| SD0439 #02 Y:2011 | 02 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,678 | $700 | |
| SD0439 #01 Y:2011 | 01 | 2011 | Reduce the pressure of compressed air to the minimum required | $2,054 | $100 | |
| SD0438 #06 Y:2011 | 06 | 2011 | Install skylights | $8,562 | $25,530 | |
| SD0438 #05 Y:2011 | 05 | 2011 | Optimize plant power factor | $12,712 | $37,600 | |
| SD0438 #04 Y:2011 | 04 | 2011 | Use cooling tower or economizer to replace chiller cooling | $28,654 | $53,450 | |
| SD0438 #03 Y:2011 | 03 | 2011 | Utilize controls to operate equipment only when needed | $1,445 | $1,530 | |
| SD0438 #02 Y:2011 | 02 | 2011 | Cover open tanks | $36,210 | $16,850 | |
| SD0438 #01 Y:2011 | 01 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,004 | $300 | |
| MA0667 #12 Y:2010 | 12 | 2010 | Insulate bare equipment | $98 | $201 |