Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

315

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Measuring and controlling devices, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0637 #07 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $315 $350
AM0637 #06 Y:2013 Reduce the pressure of compressed air to the minimum required $960 $15
AM0637 #05 Y:2013 Eliminate or reduce compressed air usage $1,500 $260
AM0637 #04 Y:2013 Use separate switches on perimeter lighting which may be turned off when natural light is available $1,790 $4,250
AM0637 #03 Y:2013 Install skylights $4,110 $6,350
AM0637 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $10,130 $5,300
AM0637 #01 Y:2013 Convert to high volume low pressure (hvlp) paint guns $14,820 $400
SD0439 #06 Y:2011 Recover waste heat from equipment $163,156 $302,600
SD0439 #05 Y:2011 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $110,990 $185,200
SD0439 #04 Y:2011 Use cooling tower or economizer to replace chiller cooling $5,851 $8,326
SD0439 #03 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $16,510 $5,375
SD0439 #02 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $5,678 $700
SD0439 #01 Y:2011 Reduce the pressure of compressed air to the minimum required $2,054 $100
SD0438 #06 Y:2011 Install skylights $8,562 $25,530
SD0438 #05 Y:2011 Optimize plant power factor $12,712 $37,600
SD0438 #04 Y:2011 Use cooling tower or economizer to replace chiller cooling $28,654 $53,450
SD0438 #03 Y:2011 Utilize controls to operate equipment only when needed $1,445 $1,530
SD0438 #02 Y:2011 Cover open tanks $36,210 $16,850
SD0438 #01 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $2,004 $300
MA0667 #12 Y:2010 Insulate bare equipment $98 $201