ITAC Assessment: SD0438
ITAC logo
ITAC Assessment: SD0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Propulsion Engines
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 1,200
Plant Area 326,000
ft2
Annual Production 30
pieces
Production Hrs. Annual 4,940
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,512,268 17,853,182
kWh
Electricity Demand $497,564 38,882
kW-mo/yr
Electricity Fees $311,693 -
Natural Gas $179,095 26,225
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,587 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,004 $300 $1,661
19,605
kWh
$344
-
kW-mo/yr
- -
02 2.2514: Cover open tanks $36,210 $16,850 $17,462
206,167
kWh
- - $18,748
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $1,445 $1,530 $1,445
17,063
kWh
- - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $28,654 $53,450 $28,654
338,305
kWh
- - -
05 2.3212: Optimize plant power factor $12,712 $37,600 - - $12,712 -
06 2.7145: Install skylights $8,562 $25,530 $5,977
67,770
kWh
$2,585
-
kW-mo/yr
- -
TOTAL RECOMMENDED $89,587 $135,260 $55,199
648,910
kWh
$2,928
-
kW-mo/yr
$12,712 $18,748
-
MMBtu
TOTAL IMPLEMENTED $14,716 $37,900 $1,661
19,605
kWh
$344
-
kW-mo/yr
$12,712 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs