ITAC Assessment: AM0637
ITAC logo
ITAC Assessment: AM0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product jet engine testing equipment and metal fabricating
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 67,000
ft2
Annual Production 8
pieces
Production Hrs. Annual 2,636
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,263 542,700
kWh
Electricity Demand $10,695 2,677
kW-mo/yr
Electricity Fees $3,056 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,820 $400 - - $14,820
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,130 $5,300 $7,400
115,600
kWh
$2,730
-
kW-mo/yr
-
03 2.7145: Install skylights $4,110 $6,350 $4,110
64,330
kWh
- -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,790 $4,250 $1,790
28,000
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $1,500 $260 $1,500
23,500
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $960 $15 $700
10,900
kWh
$260
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $315 $350 $230
3,600
kWh
$85
-
kW-mo/yr
-
08 2.7124: Make a practice of turning off lights when not needed $260 - $260
4,030
kWh
- -
09 2.4314: Use synthetic lubricant $146 - $107
1,670
kWh
$39
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,031 $16,925 $16,097
251,630
kWh
$3,114
-
kW-mo/yr
$14,820
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs