Assessment Year | 2013 |
---|---|
Principal Product | jet engine testing equipment and metal fabricating |
NAICS | 334519: Other Measuring and Controlling Device Manufacturing |
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
67,000
ft2
|
Annual Production | 8
pieces
|
Production Hrs. Annual | 2,636
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $34,263 | 542,700 |
kWh
|
$0.063 |
Electricity Demand | $10,695 | 2,677 |
kW-mo/yr
|
$4.00 |
Electricity Fees | $3,056 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $14,820 | $400 | - | - | $14,820 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,130 | $5,300 |
$7,400
115,600
kWh
|
$2,730
-
kW-mo/yr
|
- | |
03 | 2.7145: Install skylights | $4,110 | $6,350 |
$4,110
64,330
kWh
|
- | - | |
04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,790 | $4,250 |
$1,790
28,000
kWh
|
- | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $1,500 | $260 |
$1,500
23,500
kWh
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $960 | $15 |
$700
10,900
kWh
|
$260
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $315 | $350 |
$230
3,600
kWh
|
$85
-
kW-mo/yr
|
- | |
08 | 2.7124: Make a practice of turning off lights when not needed | $260 | - |
$260
4,030
kWh
|
- | - | |
09 | 2.4314: Use synthetic lubricant | $146 | - |
$107
1,670
kWh
|
$39
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $34,031 | $16,925 |
$16,097
251,630
kWh
|
$3,114
-
kW-mo/yr
|
$14,820 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs