ITAC Assessment: UD0756
ITAC logo
ITAC Assessment: UD0756
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Plastic Bottles
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 97
Plant Area 200,000
ft2
Annual Production 417,343
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,021,202 45,712,800
kWh
Natural Gas $61,187 3,607
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $415,115 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $270,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
01 2.3137: Use power during off-peak periods $58,368 - - $58,368 - - -
02 2.6124: Establish equipment maintenance schedule $54,790 - $55,669
1,159,782
kWh
- - $(-879.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $46,822 $18,000 $46,822
975,467
kWh
- - - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $42,997 $210,200 $12,085
251,778
kWh
- - $27,407 $3,505
05 2.7142: Utilize higher efficiency lamps and/or ballasts $44,237 $86,570 $41,824
871,333
kWh
- - $2,413 -
06 3.4116: Meter recycled water (to reduce sewer charges) $30,653 $5,000 - - - $30,653 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $30,570 - $30,570
636,888
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $30,516 $30,000 $30,516
635,746
kWh
- - - -
09 2.2511: Insulate bare equipment $26,847 $15,750 $26,847
559,319
kWh
- - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,180 $12,000 $26,180
545,500
kWh
- - - -
11 2.7313: Recycle air for heating, ventilation and air conditioning $13,900 $15,000 - - $13,900
-
MMBtu
- -
12 2.8118: Check for accuracy of utility / power meters $4,769 - - - - $4,769 -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $4,160 $4,680 $4,160
80,864
kWh
- - - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $306 $150 $306
6,381
kWh
- - - -
TOTAL RECOMMENDED $415,115 $397,350 $274,979
5,723,058
kWh
$58,368 $13,900
-
MMBtu
$64,363 $3,505
TOTAL IMPLEMENTED $270,285 $126,400 $174,961
3,639,327
kWh
$58,368 - $36,956 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs