ITAC Assessment: MA0667
ITAC logo
ITAC Assessment: MA0667
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Measurement, Analysis and Control Devices
NAICS 334519: Other Measuring and Controlling Device Manufacturing
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 494
Plant Area 700,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,960,983 16,044,228
kWh
Electricity Demand $162,308 40,598
kW-mo/yr
Natural Gas $554,315 62,310
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,154 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $45,912 $17,705 $16,734
137,162
kWh
$29,178
-
MMBtu
02 2.1116: Improve combustion control capability $31,118 $100,000 - $31,118
-
MMBtu
03 2.2611: Moderate cooling tower outlet temperature $11,694 $10,590 $11,694
95,851
kWh
-
04 2.7314: Reduce ventilation air $8,118 - $4,978
40,800
kWh
$3,140
-
MMBtu
05 2.7132: Install timers on light switches in little used areas $3,023 $250 $3,023
24,780
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $2,246 $3,000 $2,246
18,414
kWh
-
07 2.2614: Use cooling tower or economizer to replace chiller cooling $5,047 $17,500 $5,047
41,368
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,129 $6,340 $2,129
17,453
kWh
-
09 2.4323: Use optimum size and capacity equipment $1,515 $4,000 $1,515
12,414
kWh
-
10 2.1123: Install automatic stack damper $729 $180 - $729
-
MMBtu
11 2.2511: Insulate bare equipment $525 $550 - $525
-
MMBtu
12 2.2511: Insulate bare equipment $98 $201 - $98
-
MMBtu
TOTAL RECOMMENDED $112,154 $160,316 $47,366
388,242
kWh
$64,788
-
MMBtu
TOTAL IMPLEMENTED $23,564 $11,020 $19,695
161,431
kWh
$3,869
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs