Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Optical instruments and lenses
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0775 #06 Y:2017 Re-size charging openings or add movable cover or door $708 $412
MA0775 #05 Y:2017 Utilize higher efficiency lamps and/or ballasts $2,966 $20,488
MA0775 #04 Y:2017 Use cooling tower or economizer to replace chiller cooling $10,486 $21,000
MA0775 #03 Y:2017 Air condition only space necessary $13,365 $7,900
MA0775 #02 Y:2017 Apply for tax-free status for energy purchases $20,697 $100
MA0775 #01 Y:2017 Optimize plant power factor $28,320 $16,929
MA0770 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $124 $100
MA0770 #04 Y:2016 Lower temperature during the winter season and vice-versa $286 $20
MA0770 #03 Y:2016 Optimize plant power factor $1,809 $2,784
MA0770 #02 Y:2016 Air condition only space necessary $2,351 $1,000
MA0770 #01 Y:2016 Reduce ventilation air $8,661 $1,503
MA0753 #06 Y:2015 Insulate glazing, walls, ceilings, and roofs $842 $2,152
MA0753 #05 Y:2015 Insulate bare equipment $1,226 $1,400
MA0753 #04 Y:2015 Install occupancy sensors $1,608 $4,608
MA0753 #03 Y:2015 Reduce ventilation air $4,632 $6,000
MA0753 #02 Y:2015 Reduce ventilation air $7,290 $5,575
MA0753 #01 Y:2015 Replace electrically-operated equipment with fossil fuel equipment $18,534 $67,200
MA0708 #04 Y:2013 Reduce the pressure of compressed air to the minimum required $1,828 $3,200
MA0708 #03 Y:2013 Turn off equipment when not in use $3,140 $400
MA0708 #02 Y:2013 Reduce ventilation air $3,194 $7,450