ITAC Assessment: MA0775
ITAC logo
ITAC Assessment: MA0775
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Ceramic actuators
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 50,000
ft2
Annual Production 6
units
Production Hrs. Annual 2,040
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,639 2,441,120
kWh
Electricity Demand $141,725 9,266
kW-mo/yr
Electricity Fees $22,061 -
Natural Gas $7,399 650
MMBtu
Waste Disposal Costs
Water Usage $1,081 122,680
Tgal
TOTAL YEARLY COSTS $352,905
RECOMMENDED SAVINGS* $76,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $28,320 $16,929 - $28,320
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $20,697 $100 - - $20,697 -
03 2.7229: Air condition only space necessary $13,365 $7,900 $13,365
180,614
kWh
- - -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $10,486 $21,000 $10,486
141,697
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,966 $20,488 $2,966
40,080
kWh
- - -
06 2.2531: Re-size charging openings or add movable cover or door $708 $412 - - - $708
-
MMBtu
TOTAL RECOMMENDED $76,542 $66,829 $26,817
362,391
kWh
$28,320
-
kW-mo/yr
$20,697 $708
-
MMBtu
TOTAL IMPLEMENTED $20,697 $100 - - $20,697 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs