ITAC Assessment: MA0770
ITAC logo
ITAC Assessment: MA0770
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Actuators
NAICS 333314: Optical Instrument and Lens Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 70,000
ft2
Annual Production 12
units
Production Hrs. Annual 2,040
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,799 1,389,900
kWh
Electricity Demand $44,160 2,881
kW-mo/yr
Electricity Fees $900 -
Natural Gas $19,270 1,636
MMBtu
Waste Disposal Costs
Water Usage $5,305 1,126,940
Tgal
TOTAL YEARLY COSTS $173,434
RECOMMENDED SAVINGS* $13,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $8,661 $1,503 $2,344
31,377
kWh
- $6,317
-
MMBtu
02 2.7229: Air condition only space necessary $2,351 $1,000 $206
2,754
kWh
- $2,145
-
MMBtu
03 2.3212: Optimize plant power factor $1,809 $2,784 - $1,809
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $286 $20 $286
3,823
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $124 $100 $124
1,650
kWh
- -
TOTAL RECOMMENDED $13,231 $5,407 $2,960
39,604
kWh
$1,809
-
kW-mo/yr
$8,462
-
MMBtu
TOTAL IMPLEMENTED $1,933 $2,884 $124
1,650
kWh
$1,809
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs