Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Instruments for measuring and testing of electricity and electrical signals
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0223 #04 Y:2019 Lower temperature during the winter season and vice-versa $550 -
IC0223 #03 Y:2019 Recharge batteries on during off-peak demand periods $264 -
IC0223 #02 Y:2019 Install spectral reflectors / delamp $267 $2,000
IC0223 #01 Y:2019 Install occupancy sensors $210 $24
IC0222 #03 Y:2019 Recharge batteries on during off-peak demand periods $524 -
IC0222 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $757 $320
IC0222 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $4,363 $2,231
MZ0218 #06 Y:2016 Install occupancy sensors $1,603 $900
MZ0218 #05 Y:2016 Lower temperature during the winter season and vice-versa $3,810 -
MZ0218 #04 Y:2016 Install occupancy sensors $2,293 $900
MZ0218 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,572 $10,350
MZ0218 #02 Y:2016 Use photocell controls $2,869 $490
MZ0218 #01 Y:2016 Replace existing hvac unit with high efficiency model $3,078 $12,500
MZ0217 #07 Y:2016 Insulate bare equipment $668 $600
MZ0217 #06 Y:2016 Use waste heat from flue gases to heat space conditioning air $7,627 $20,000
MZ0217 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $841 $1,100
MZ0217 #04 Y:2016 Install occupancy sensors $6,607 $3,000
MZ0217 #03 Y:2016 Utilize higher efficiency lamps and/or ballasts $23,739 $80,500
MZ0217 #02 Y:2016 Lower temperature during the winter season and vice-versa $27,674 $30,000
MZ0217 #01 Y:2016 Condense operation into one building $4,197 $900