ITAC Assessment: MZ0218
ITAC logo
ITAC Assessment: MZ0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Automobile instrumentation
NAICS 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 63,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 4,300
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,671 1,222,280
kWh
Electricity Demand $14,706 4,525
kW-mo/yr
Natural Gas $17,356 1,550
MMBtu
TOTAL YEARLY COSTS $123,733
RECOMMENDED SAVINGS* $18,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7232: Replace existing hvac unit with high efficiency model $3,078 $12,500 $2,798
37,308
kWh
$280
-
kW-mo/yr
-
02 2.7134: Use photocell controls $2,869 $490 $2,869
38,250
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,572 $10,350 $4,078
54,374
kWh
$494
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $2,293 $900 $2,293
30,579
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $3,810 - $1,357
18,092
kWh
$146
-
kW-mo/yr
$2,307
-
MMBtu
06 2.7135: Install occupancy sensors $1,603 $900 $1,603
21,375
kWh
- -
TOTAL RECOMMENDED $18,225 $25,140 $14,998
199,978
kWh
$920
-
kW-mo/yr
$2,307
-
MMBtu
TOTAL IMPLEMENTED $11,337 $12,640 $10,843
144,578
kWh
$494
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs