ITAC Assessment: TN0344
ITAC logo
ITAC Assessment: TN0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product HEAVY METAL PRODUCTS
NAICS
n/a
SIC 3483: Ammunition, Except for Small Arms
Sales Range $50
M
to 100
M
# of Employees 207
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,100
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $813,393 16,212,779
kWh
LPG $25,000 3,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2531: Re-size charging openings or add movable cover or door $36,635 - $36,635
732,708
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,098 $1,850 $18,098
361,958
kWh
03 2.7243: Improve air circulation with destratification fans / other methods $7,913 $5,000 $7,913
158,265
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,521 $1,313 $2,521
50,410
kWh
05 2.4312: Improve lubrication practices $982 - $982
19,637
kWh
06 2.4221: Install compressor air intakes in coolest locations $840 $1,200 $840
16,999
kWh
07 2.3212: Optimize plant power factor $6,206 $6,400 $6,206
-
kWh
TOTAL RECOMMENDED $73,195 $15,763 $73,195
1,339,977
kWh
TOTAL IMPLEMENTED $21,459 $4,363 $21,459
429,367
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs