ITAC Assessment: GT0817
ITAC logo
ITAC Assessment: GT0817
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Industrial Fabric for Conveyer Belts
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 500,000
ft2
Annual Production 21,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $404,537 10,211,082
kWh
Electricity Demand $80,557 18,207
kW-mo/yr
Electricity Fees $67,169 -
Natural Gas $332,449 30,291
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,907 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,299

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $8,981 $1,333 $8,981
252,288
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $40,933 $164,201 $30,883
664,148
kWh
$10,050
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,177 $9,625 $9,233
247,557
kWh
$1,944
-
kW-mo/yr
- -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $3,469 $7,920 $3,469
97,445
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,652 $500 $2,652
74,481
kWh
- - -
06 2.4224: Upgrade controls on compressors $2,666 $1,500 $2,666
74,880
kWh
- - -
07 2.2414: Use waste heat from hot flue gases to preheat $32,042 $15,000 - - - $32,042
-
MMBtu
08 2.8112: Combine utility meters $1,987 - - - $1,987 -
TOTAL RECOMMENDED $103,907 $200,079 $57,884
1,410,799
kWh
$11,994
-
kW-mo/yr
$1,987 $32,042
-
MMBtu
TOTAL IMPLEMENTED $14,299 $3,333 $14,299
401,649
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs