ITAC Assessment: IC0223
ITAC logo
ITAC Assessment: IC0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product High Value Technical Pouches
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 112,000,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,482 474,813
kWh
Electricity Demand $33,201 5,135
kW-mo/yr
Electricity Fees $7,738 -
Natural Gas $7,155 1,310
MMBtu
TOTAL YEARLY COSTS $70,576
RECOMMENDED SAVINGS* $1,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $210 $24 $210
4,193
kWh
- - -
02 2.7144: Install spectral reflectors / delamp $267 $2,000 $45
899
kWh
$22
-
kW-mo/yr
- $200
03 2.3132: Recharge batteries on during off-peak demand periods $264 - - $264
-
kW-mo/yr
- -
04 2.7221: Lower temperature during the winter season and vice-versa $550 - $55
1,093
kWh
- $495
-
MMBtu
-
TOTAL RECOMMENDED $1,291 $2,024 $309
6,185
kWh
$287
-
kW-mo/yr
$495
-
MMBtu
$200
TOTAL IMPLEMENTED $550 - $55
1,093
kWh
- $495
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs