| Assessment Year | 2017 |
|---|---|
| Principal Product | Coated Brake & Fuel Line (bulk) / Extruded Polymer Tubing (bulk) |
| NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 140 |
| Plant Area |
210,000
ft2
|
| Annual Production | 452,533,162
pieces
|
| Production Hrs. Annual | 6,912
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $742,212 | 15,532,000 |
kWh
|
$0.048 |
| Natural Gas | $195,999 | 28,530 |
MMBtu
|
$6.87 |
| TOTAL YEARLY COSTS | $938,211 | |||
| RECOMMENDED SAVINGS* | $83,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,639 | $3,500 |
$4,639
96,644
kWh
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $3,238 | $5,400 |
$3,238
67,461
kWh
|
- | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,659 | $3,700 | - |
$2,659
-
MMBtu
|
- | |
| 04 | 2.1336: Install equipment to utilize waste fuel | $73,386 | $150,000 | - | - | $73,386 | |
| TOTAL RECOMMENDED | $83,922 | $162,600 |
$7,877
164,105
kWh
|
$2,659
-
MMBtu
|
$73,386 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs