ITAC Assessment: UM0479
ITAC logo
ITAC Assessment: UM0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Coated Brake & Fuel Line (bulk) / Extruded Polymer Tubing (bulk)
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 210,000
ft2
Annual Production 452,533,162
pieces
Production Hrs. Annual 6,912
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $742,212 15,532,000
kWh
Natural Gas $195,999 28,530
MMBtu
TOTAL YEARLY COSTS $938,211
RECOMMENDED SAVINGS* $83,922 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Raw Material Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,639 $3,500 $4,639
96,644
kWh
- -
02 2.7135: Install occupancy sensors $3,238 $5,400 $3,238
67,461
kWh
- -
03 2.2414: Use waste heat from hot flue gases to preheat $2,659 $3,700 - $2,659
-
MMBtu
-
04 2.1336: Install equipment to utilize waste fuel $73,386 $150,000 - - $73,386
TOTAL RECOMMENDED $83,922 $162,600 $7,877
164,105
kWh
$2,659
-
MMBtu
$73,386
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs